Dear Sir,
I have solved this question. The difference was that with a model, I was working with 2012.11.30 and with the other, it was 2013.1.15.
When I used "CSP Trough Empirical, Commercial" and "CSP Trough Empirical,Independent Power Producer" with 2013.1.15 Version, I have the same results.
But, I have a new question. Is there a production margin applied about 5%?
Thank you very much.