- Posts: 8
IPH Trough MS Financial Model and Results
- JULIAN IGNACIO PRIETO PRIETO
- Topic Author
        Less
        More
        
            
    
        
            
        
                01 Dec 2023 09:20                #12711
        by JULIAN IGNACIO PRIETO PRIETO
    
    
 	
					
                                	
			
				    
            
            
            
            
            
                                
    
                                                
    
        IPH Trough MS Financial Model and Results was created by JULIAN IGNACIO PRIETO PRIETO            
    
        Dear Paul. 
It seems that the system did not give the "GO" to my last update on the case before you closed the case "Error Message Financial Parameters IPH Trough Calc + Molten Salt, SAM 2022."
Thanks again for your help on this subject. I have adjusted the Max Single Loop Flow Rate to 15Kg/s, and used 8 SCA / HCE per loop per your recommendation. The Changes in the Desing Point DNI were unsuccessful since increasing the number above 400 was detrimental to the Capacity Factor and the LCOE. (See the reasoning behind the selected value In the attached PDF file).
Nevertheless, I may have gotten a completely successful simulation with no error messages after different trials and parametric runs. I want to be sure since I must deliver results very soon. I would appreciate your cross-checking the results of the IPH Trough Barranca MS 23Nov23 case inside.
I have included the SAM file and a PDF file explaining what I have done so far.
I may also need your guidance on the procedure to obtain the complete Financial reporting and results from the simulation to support my design choices.
Thanks and best regards,
Julian Prieto
     
    It seems that the system did not give the "GO" to my last update on the case before you closed the case "Error Message Financial Parameters IPH Trough Calc + Molten Salt, SAM 2022."
Thanks again for your help on this subject. I have adjusted the Max Single Loop Flow Rate to 15Kg/s, and used 8 SCA / HCE per loop per your recommendation. The Changes in the Desing Point DNI were unsuccessful since increasing the number above 400 was detrimental to the Capacity Factor and the LCOE. (See the reasoning behind the selected value In the attached PDF file).
Nevertheless, I may have gotten a completely successful simulation with no error messages after different trials and parametric runs. I want to be sure since I must deliver results very soon. I would appreciate your cross-checking the results of the IPH Trough Barranca MS 23Nov23 case inside.
I have included the SAM file and a PDF file explaining what I have done so far.
I may also need your guidance on the procedure to obtain the complete Financial reporting and results from the simulation to support my design choices.
Thanks and best regards,
Julian Prieto