I understand that GETEM was used to build the SAM geothermal model.
I have concerns about using what was in GETEM and it appears that SAM fails in some basic areas, such as omitting well pumps, calculating gathering system costs, and estimating the power plant $/kW cost.
I would really like to see it work, because GETEM is a MESS. I can help with some of these things.
Please let me know.
Gary McKay