Small-scale CSP

  • Bernardo Almeida
  • Topic Author
More
16 May 2022 22:27 #10964 by Bernardo Almeida
Small-scale CSP was created by Bernardo Almeida
Hello!
I am doing a research about small-scale CSP with ORC, using Parabolic Trough Collector (PTC).
The way to model a 50kWe CSP, for example, is the same or are there any inputs that I need to consider to have reliable results?

Thank you!

Please Log in or Create an account to join the conversation.

  • Paul Gilman
More
19 May 2022 17:06 #10972 by Paul Gilman
Replied by Paul Gilman on topic Small-scale CSP
Hi Bernardo,

SAM does not impose a limit on the size of the system. However the default inputs for the CSP models are for relatively large power generation systems on the order of 100 MW nameplate capacity. To model smaller systems you will need to carefully review all of the inputs.

Here are some suggestions:

Pay special attention to inputs that are not normalized to the nameplate capacity. For example, an input that has units MWe/MW_design or % probably does not need to be changed, but an input that is MWe or MWt may need to be changed if you are changing the system size by an order of magnitude compared to the default size.

Neither the power cycle design efficiency input nor the default power cycle off-design inputs change with cycle capacity, so you will have to change those values.

After making these changes, run a simulation, and carefully review the time series results, especially for parasitic and pumping power loads, to make sure they are in the correct range. Change inputs as needed, and then run the simulation again until you are satisfied with the results.

Best regards,
Paul.