Output kW load data, PV kW production data, and the Net difference between the two
- becerrae
- Topic Author
        Less
        More
        
            
    
        
            
        
                13 Oct 2012 10:36                #963
        by becerrae
    
    
            
            
            
            
            
                                
    
                                                
    
        Output kW load data, PV kW production data, and the Net difference between the two  was created by becerrae            
    
        I would like to be able to take the 8760 data (scaled) for the load, and add the 8760 simulation data, and add the two together to get the net. In the current (2012 Beta version) of SAM, I do not seem to be able to get the system to work. I uploaded 8760 hourly load profile into the Electric Load section, but when I pull out the Year 1 hourly energy demand (kWh), the values are as such repeating every 24 hour cycle for the full 8760 output set.
0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0,0,0,0,0,0,0,0,0,
0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,
    0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0,0,0,0,0,0,0,0,0,
0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,0.008316,
Please Log in or Create an account to join the conversation.
- Paul Gilman
        Less
        More
        
            
    
        - Posts: 5665
            
        
                15 Oct 2012 12:26                #964
        by Paul Gilman
    
    
            
            
            
            
            
                                
    
                                                
    
        Replied by Paul Gilman on topic Output kW load data, PV kW production data, and the Net difference between the two             
    
        Hello,
Thank you for the feedback.
We are aware of an issue in SAM Beta 2012.9.27 with the hourly results for the residential and commercial projects that I think explains your observation.
Would you mind replying with a copy of your .zsam file attached so that I can confirm that you did not find a different issue?
Best regards,
Paul.
    Thank you for the feedback.
We are aware of an issue in SAM Beta 2012.9.27 with the hourly results for the residential and commercial projects that I think explains your observation.
Would you mind replying with a copy of your .zsam file attached so that I can confirm that you did not find a different issue?
Best regards,
Paul.