- Posts: 1
Different incentive rates for multiple subsystems
- Joia
- Topic Author
        Less
        More
        
            
    
        
            
        
                24 May 2012 15:29                #583
        by Joia
    
    
            
            
            
            
            
                                
    
                                                
    
        Different incentive rates for multiple subsystems was created by Joia            
    
        Is it possible to use different incentive rates for each subsystem in a multiple-subsystem calcuation?  I would like to be able to run financial models on multiple-site projects, but the sites are spread out across different states and utilities.
    
    Please Log in or Create an account to join the conversation.
- Paul Gilman
        Less
        More
        
            
    
        - Posts: 5665
            
        
                25 May 2012 16:34                #584
        by Paul Gilman
    
    
            
            
            
            
            
                                
    
                                                
    
        Replied by Paul Gilman on topic Different incentive rates for multiple subsystems            
    
        The multiple subsystems simulation option is intended for modeling a system at a single site that consists of several systems with different configurations. Although you can use a weather file for a different location for each tab, SAM applies the financial assumptions (including incentives) for a single case to the entire system.
Best regards,
Paul.
    Best regards,
Paul.
Please Log in or Create an account to join the conversation.
        Moderators: Paul Gilman    
 
  
 















