- Posts: 1
Different incentive rates for multiple subsystems
- Joia
- Topic Author
Less
More
24 May 2012 15:29 #583
by Joia
Different incentive rates for multiple subsystems was created by Joia
Is it possible to use different incentive rates for each subsystem in a multiple-subsystem calcuation? I would like to be able to run financial models on multiple-site projects, but the sites are spread out across different states and utilities.
Please Log in or Create an account to join the conversation.
- pgilman
Less
More
- Posts: 5423
25 May 2012 16:34 #584
by pgilman
Replied by pgilman on topic Different incentive rates for multiple subsystems
The multiple subsystems simulation option is intended for modeling a system at a single site that consists of several systems with different configurations. Although you can use a weather file for a different location for each tab, SAM applies the financial assumptions (including incentives) for a single case to the entire system.
Best regards,
Paul.
Best regards,
Paul.
Please Log in or Create an account to join the conversation.
Moderators: pgilman