Different incentive rates for multiple subsystems

  • Joia
  • Topic Author
More
24 May 2012 15:29 #583 by Joia
Is it possible to use different incentive rates for each subsystem in a multiple-subsystem calcuation? I would like to be able to run financial models on multiple-site projects, but the sites are spread out across different states and utilities.

Please Log in or Create an account to join the conversation.

  • pgilman
More
25 May 2012 16:34 #584 by pgilman
The multiple subsystems simulation option is intended for modeling a system at a single site that consists of several systems with different configurations. Although you can use a weather file for a different location for each tab, SAM applies the financial assumptions (including incentives) for a single case to the entire system.

Best regards,
Paul.

Please Log in or Create an account to join the conversation.

Moderators: pgilman
Powered by Kunena Forum