Hello,
I did a parametric analysis using two inputs (TES(hrs) and Design gross out put (MW)) and two outputs (Levelized cost (nominal) (cents/kWh) and Levelized PPA price (real) (cents/kWh)). The SAM file and excel file are attached (3.Sam and SAM parametric analysis 2.xlsx) in the first Post posted on 26-10-2016. Can't we get an idea on feasibility using these results?
I have no clear idea on PPA. does PPA equal sell rate (tariff)?.In Sri Lanka there is no different tariff rates for different time slots (considering peak and off peak time periods). If I have misunderstood the definitions of these terms please advise me on that also.
Thank you,