- Posts: 12
Receiver turndown parameters
- rid7043
- Topic Author
Less
More
16 Jun 2015 03:11 #3433
by rid7043
Receiver turndown parameters was created by rid7043
In the molted salt tower, the receiver starts up while the next conditions are achieved:
• Minimum receiver turndown fraction: required power in the receiver to startup
• Receiver startup delay time: the available time to achieve the energy.
• Receiver startup delay energy fraction: required power during the delay time to achieve a certain energy for startup the receiver.
Is right the consideration I have done? It can be resumed as two requirements, on one hand the minimum power and on the other hand the minimum absorbed energy during a certain time.
Thanks
• Minimum receiver turndown fraction: required power in the receiver to startup
• Receiver startup delay time: the available time to achieve the energy.
• Receiver startup delay energy fraction: required power during the delay time to achieve a certain energy for startup the receiver.
Is right the consideration I have done? It can be resumed as two requirements, on one hand the minimum power and on the other hand the minimum absorbed energy during a certain time.
Thanks
Please Log in or Create an account to join the conversation.
- pgilman
Less
More
- Posts: 5423
16 Jun 2015 11:07 #3434
by pgilman
Replied by pgilman on topic Receiver turndown parameters
Yes. Your description is correct.
Best regards,
Paul.
Best regards,
Paul.
Please Log in or Create an account to join the conversation.
Moderators: pgilman