Hi,
I used SAM to make a simulation of two power plants a PV plant with 100MW and another CSP plant with 100MW too, to have a hybrid system of 100MW, the PV works during the day and the CSP works to complete the difference not produced by the PV , and stock at the same time to generate the 100MW when the PV no longer works. I combine them with the option `` combine cases '', the problem is that I got a production with peaks (up to 200MW) in the hours from 2 p.m until 6 p.m, even if I have well do the energy distribution as needed in the storage part `` system control '', in fact I still use the 2018 version, is that why I got this error? otherwise I want a constant 100MW output for the whole day. where do you think this problem comes from?
I leave you my SAM file in attachment.
thank you for the help.
best regards