Hi,
I am trying to model a hybrid plant of Solar Tower CSP and PV. I created a General System to combine the two cases, but after I run the simulation it gives me an error and a message regarding the CSP. You can find both the message and the final error attached.
Thank you
Luisa

Please Log in or Create an account to join the conversation.

  • pgilman
More
14 Apr 2020 16:43 - 18 May 2023 09:34 #8120 by pgilman
UPDATE: As of SAM 2021.12.02, the Combine Cases macro is replaced by the Calculate generation profiles and nameplate capacity from open cases option on the Power Plant page for the Generic System model and Generic Battery model. See the SAM YouTube channel for a short tutorial .

Please see sam.nrel.gov/forum/forum-general/2973-hybrid-csp-pv-error-in-running-combine-cases-macros.html .

Best regards,
Paul.
Last edit: 18 May 2023 09:34 by pgilman.

Please Log in or Create an account to join the conversation.

  • Pesenti
  • Topic Author
More
15 Apr 2020 00:46 #8122 by Pesenti
here is the sam file.
Best regards,
Luisa

File Attachment:

File Name: Hybrid1.sam
File Size:257 KB
Attachments:

Please Log in or Create an account to join the conversation.

  • pgilman
More
15 Apr 2020 11:29 #8128 by pgilman
Hi Luisa,

Thank you for sending the file.

In SAM 2020.2.29, the Detailed PV model runs a simulation over the analysis period to better model module degradation. It turns out that the Combine Cases macro was written to work only for simulations over a single year, which was the behavior in earlier versions of SAM. We will need to update the macro to fix the problem, which we will do for the next software update.

In the meantime, I posted instructions for a workaround on the SAM GitHub repository:

github.com/NREL/SAM/issues/282

Best regards,
Paul.