3 posts / 0 new
Last post
Carlos2609
Carlos2609's picture
Comisión Federal de Electricidad Tarifa H-M

Hi I need your support:

Comisión Federal de Electricidad Tarifa H-M

This is an error in the System Advisor Model (SAM), which is managed by a different group at NREL. Please submit a request at the SAM Support Forum, something like:

Error simulating rate https://openei.org/apps/IURDB/rate/view/59b02f375457a3106b17eed8:

exec fail(utilityrate5): Energy rate TOU Period 12 not found for Month may.

Simulation utilityrate5 failed.

Carlos Centeno

Paul Gilman

Dear Carlos,

This rate structure requires 36 time of use (TOU) periods, but SAM only allows up to 12 periods. We are considering allowing up to 36 periods in a future version.

Best regards,
Paul.

ndiorio
ndiorio's picture

We've also considered offering the ability to upload a time-series of energy rates that would be used in a "real-time pricing" option. This would offer the most flexibility.