Hello,
SAM's battery model is designed to model grid-connected photovoltaic systems that meet a residential or commercial building's electric load. It assumes that the battery is connected to the system on the AC side of the photovoltaic inverter.
Are you using the "Manual Dispatch Model?" If so, be sure that "Charge from PV" is checked for the time periods that the PV output exceeds the load. Also, you can specify whether to prioritize meeting the load or charging the battery from the PV array.
If you would like me to review your file, please
email me
a copy of your file.
Best regards,
Paul.